1、 Construction

Measurement and positioning → Support and hanger manufacturing device → Bridge device → Grounding treatment

2、 Construction methods and skill methods

(1) Measurement and positioning: Use the line snapping method to mark the equipment position of the bridge, determine the fixed position of the bracket, and mark it correctly. Composite cable tray is the second generation product in the cable tray series and a new type of cable tray. It is suitable for laying various projects, units, and cables. It has the characteristics of simple structure, flexible configuration, convenient installation, and novel form. The positioning of the bridge in the vertical shaft should first use the suspension line method to determine the device reference line. If the reserved hole is not suitable, it should be adjusted and repaired in real time.

(2) Bracket manufacturing device

(3) According to the construction drawing design elevation and bridge specifications, locate and manufacture the bracket based on the measured dimensions. These brackets are produced in the factory. All components of the cable tray need to be galvanized and installed on the outdoor tray outside the building. The full name of a rigid structural system, including straight sections, elbows, tees, groove types, tray or stepped cross sections, as well as support arms, hangers, etc., which have tightly connected support cables. Slot type cable tray, also known as slot type cable tray, is a fully enclosed cable tray suitable for laying computer cables, communication cables, thermocouple cables, and other control cables for high sensitivity systems. It has good effects on shielding control cables from interference and protecting cables in highly corrosive environments. There is no ceiling beam bottom lifting or wall support device, but there is a ceiling internal lifting or wall support device. In public places without suspended ceiling, connect structural members, and take into account the beauty and convenience of construction and maintenance, use wall or column support devices or install them on the bottom chord members of Truss roof. The bracket of the wall mounted device is fixed with expansion bolts, and the spacing between the brackets does not exceed 2 meters. Supports and hangers should be added at the intersection of straight and non straight sections, at the deformation joints of buildings, and in the middle of non straight sections with a bending radius greater than 300mm. The support and hanger device should ensure that the degree or verticality of the bridge meets the requirements.

(4) Bridging device

① Regarding the extraordinary appearance of the bridge, the dimensions measured on-site will be handed over to the means supplier, who will manufacture based on the dimensions and reduce on-site processing. The material, model, thickness, and accessories of the bridge meet the design requirements.

② Before installing the bridge, it is necessary to coordinate with various specialties to prevent conflicts between large diameter fire pipes, sprinkler pipes, hot and cold water pipes, drainage pipes, as well as air conditioning and exhaust equipment.

③ Lift the bridge to the predetermined position and secure it to the bracket with bolts. Carefully check the dimensions at the turn. The slope of this bridge should be the same as the slope of the building. For bridges on curved building walls, the curved shape should be consistent with the building. The bridge is connected to the bridge through a connecting plate, and the connecting bolt is a half round head bolt, which is located on the inner side of the bridge. The cracks between cable trays must meet the design requirements to ensure that the cable trays of the system are integrated.

④ Bridges crossing deformation joints in buildings should be treated as expansion joints in accordance with the enterprise standard "Special Steel Cable Tray Installation Technology". When the straight section of the steel bridge exceeds 30m, a thermal expansion compensation device should be installed.

⑤ The bridge device is horizontal and vertical, with a uniform and beautiful appearance


contact us

Jiangsu Xinhantong Intelligent Electrical Technology Co., Ltd

Tel: 0511-80303080

Fax: 0511-80303081

Address: No.1 Chaoyang North Road, Chengbei Science and Technology Industrial Park, Sanmao Street, Yangzhong City

免费无码一区无码东京热| 蜜桃视频一区二区三区在线观看 | 九九线精品视频在线观看视频| 精品久久久久精品亚洲AV| 精品国产sm捆绑最大网免费站| 最近最新视频中文字幕| 精品久久久中文字幕二区| 麻豆精产国品一二三产区区农民| 丰满老熟妇好大BBBBB仙踪林| 亚洲精品偷拍无码不卡av| 美女张开腿让男人桶视频| 最近中文字幕高清中文字幕mv| 内射一区二区精品视频在线观看 | 少妇无码av无码专区在线观看 | 精品乱码卡1卡2卡3免费| 青青青国产免A在线观看| 激情偷乱人伦小说视频| 在线a亚洲v天堂网2019无码| 国产香蕉一区二区三区在线视频| 亚洲国产良家在线观看| 男男性行为免费视频播放| 亚洲AV无码国产在丝袜APP| 青青视频在线观看免费2| 中文字幕高清在线中文字幕| 最近最好看的2018中文字幕国语| 成人性欧美丨区二区三区| 多人运动免费观看不用登录| 丰满少妇内射一区| 精品AV无码国产一区二区| 亚洲精品~无码抽插| 无遮挡免费高清羞羞视频| 日本japanese丰满少妇| 24小时日本高清免费看下载| 爆乳熟妇一区二区三区霸乳| GOGO人体无码一区二区| 亚洲综合av一区二区三区| 一个人看的日本hd免费| 香港日本三级亚洲三级| 老女人擦她毛荫荫的黑森林| 国产精品无码免费播放| 国产乱子伦视频在线播放|